we offer chromed bar and tubes for hydualic and pheumatic cylinders. We are aiming to fulfill the requires of the clientele all around the globe.. In 2008, it was awarded with “Nationwide Export Commodity Inspection-cost-free Organization”.
Short Introduction
ZheJiang EPT EPT Industry EPTT,Ltd is a EPTTized valve manufacturing facility where intergrate casting , machining, assembling, and good quality control all collectively in our workshops. Our major product is butterfly valve, gate valve, verify valve, check valve, world valve and Y-Strainers etc.
Wafer Variety Butterfly EPT
Product Description
#8226 Solitary piece via shaft.
300PSI.
-twenty degC-120 degC |
Corrosion Defense |
Internally and externally fusion bonded epoxy powEPTTcoated( FBE) .
Notes:Style and content are topic to change without having recognize.
Installation of EPT Operator With EPTTmper Change:
Butterfly valves are provided with inner supervisory position switches. The tamper switch operates by a cam linked to the valve stem. The switch will adjust placement and shut inside of two total turns of the handwheel from the completely open position.
EPT Specification
Portion Identify | EPT | EN Spec. | ASTM Spec. | |||||
EPT | Physique | Ductile Iron | EN-JS1050 | A536 sixty five-45-twelve | ||||
Disc | Ductile Iron | EN-JS1050 | A536 sixty five-forty five-twelve | |||||
Shaft | Stainless Metal | BS970 431S29 | AISI431 | |||||
Bushing | Brass | CuZn39Pb3 | B16 C36000 | |||||
EPT Operator | EPT | Cast Iron | EN-JL1040 | A126 Course B | ||||
EPTT | Cast Iron | EN-JL1040 | A126 Course B | |||||
WormEPT | Brass | CuZn39Pb3 | B16 C36000 | |||||
Worm | Stainless Steel | BS970 420S37 | AISI420 | |||||
Handwheel | Cast Iron | EN-JL1040 | A126 Class B |
Dimension | A | B | D | E | C | F | G | H | L | M |
DN50 | one hundred ten | 74 | 90 | forty three | a hundred and twenty | one hundred seventy | sixty five | 155 | one hundred fifty | two hundred |
DN65 | 118 | eighty five | ninety | 46 | ||||||
DN80 | a hundred thirty | 95 | ninety | forty six | ||||||
DN100 | one hundred forty five | a hundred and fifteen | 90 | 51.five | ||||||
DN125 | 160 | 130 | ninety | fifty six | ||||||
DN150 | one hundred seventy five | a hundred forty five | 90 | fifty six.5 | ||||||
DN200 | two hundred | a hundred and seventy | 125 | sixty | a hundred and sixty | 225 | eighty five | 206 | 200 | three hundred |
DN250 | 250 | 208 | one hundred twenty five | sixty eight.five | ||||||
DN300 | 275 | 237.five | 125 | seventy nine.5 |
EPTT Information:
Each and every computer into a single bubble plastic bag, a number of pcs into one particular wooden case EPTen EPTT will shield the items from damage during transportation
Shipping Information:
Inside of thirty daEPTTafter orEPTTconfirmed
Certificate:
FAQ
1.Can you provide sample for testing the quality?
Sure.
two. How do we deveXiHu (West EPT) Dis.Hu (West EPT) Dis. new merchandise ?
#8226 Get trial orEPTTand sample or drawing
#8226 Design and style the drawing
#8226 Make the mould and make sample
#8226 Ship out the sample with first inspection report.
three. What is the shipping and delivery time of the orEPTT?
In between 30-forty five daEPTTafter OrEPTTconfirmation. EPT shipping can be arranged if consumer has urgent ask for.
four. What variety of trade time period we consider ?
Generally we use FOB AND CIF.
five. What type of payment phrase do you get ?
T/T and L/C.
6. What variety of forex can you get?
CNY ,USD and Euro forex.
seven. Exactly where is your closest loading port?
XiHu (West EPT) Dis.hu (West EPT) Dis.g,TianEPTT.
8.How EPTT will it just take to produce products by air?
It normally takes about at most 1 week to all main places.
9. Can consumers pay a visit to the manufacturing unit ?
Indeed. We heat-hearted welcome you to check out us.
10. Would you like to choose anybody to be your unique agent in a place or a regional market place?
Indeed.